Capital projects
Find information on King County’s wastewater capital projects, including project descriptions, locations, and status, and sign up for project updates.
Current and planned projects
Coal Creek sewer upgrade
The Coal Creek Sewer Upgrade Project will install new sewer pipes to carry more wastewater and meet the growing needs of Bellevue and Newcastle.
Eastside Interceptor Section 8 Rehabilitation Project
The Eastside Interceptor Section 8 Rehabilitation Project will repair 4,800 square feet of a 90- to 96-inch wastewater tunnel in Bellevue that is nearing the end of its useful life.
Elliott West Wet Weather Treatment Station Upgrade
King County is planning to upgrade the Elliott West Wet Weather Treatment Station to ensure compliance with stricter environmental regulations, meet the demands of a growing population, and handle a changing climate.
Georgetown Wet Weather Treatment Station
The Georgetown Wet Weather Treatment Station reduces water pollution and improves aquatic habitat and overall water quality of the Duwamish River. The station is currently operational and a ribbon cutting celebration is scheduled in 2023 after artwork installation is complete.
Interbay sewer and odor control upgrade
The Interbay Sewer and Odor Control Upgrade Project will replace aging sewer pipes in Seattle’s Interbay neighborhood and add new odor control technology.
Lake Hills and NW Lake Sammamish sewer upgrade
The Lake Hills and NW Lake Sammamish Sewer Upgrade Project will upgrade 4.5 miles of sewer pipes serving the growing Redmond and Bellevue area.
Lake Hills sewer relining
The Lake Hills Sewer Relining Project will install pipe lining along existing concrete pipe to prevent corrosion and extend the life of the pipe another 50 years.
Lakeland Hills Pump Station replacement
The Lakeland Hills Pump Station Replacement Project will replace the aging Lakeland Hills Pump Station and build a new facility in Auburn to upgrade sewer services in south King County.
Loop® vehicle maintenance facility
King County has completed construction of a new vehicle maintenance and staging facility in North Bend for transporting Loop biosolids to customers.
M Street Trunk Rehabilitation Project
The M Street Trunk Rehabilitation Project will repair about 2.6 miles of deteriorated sewer pipes in the City of Auburn.
North Mercer Island/Enatai sewer upgrade
The North Mercer Island/Enatai Sewer Upgrade Project will replace aging pipes serving areas in North Mercer Island and Bellevue near Enatai Beach, and the Town of Beaux Arts Village.
Ship Canal water quality (joint project with Seattle Public Utilities)
Seattle Public Utilities and King County Wastewater Treatment Division are building an underground storage tunnel to significantly reduce the amount of polluted stormwater (from rain) and sewage that flows into the Lake Washington Ship Canal, Salmon Bay, and Lake Union from our sewer system.
South Treatment Plant improvements
King County has a number of projects at the South Treatment Plant in Renton to replace or upgrade critical treatment plant equipment including pumps motors, and drives, which will improve system reliability, reduce maintenance costs and increase energy efficiency.
Thornton Creek Basin - sewer study and upgrade
The Thornton Creek Basin Sewer Study and Upgrade Project will ensure that the basin’s sewer pipe is able to carry wastewater flows to meet King County’s clean water goals into the future.
West Duwamish Wet Weather Storage Facility
King County’s plans to build a wet weather storage facility to hold stormwater and wastewater that currently overflows into the Duwamish River during large storms.
West Point Treatment Plant improvements
King County plans a number of improvements at the West Point Treatment Plant. Projects include upgrading and replacing aging equipment to ensure reliable operation and continued compliance with permit conditions.