The King County Solid Waste Division was allocated seven closed landfills in the 1970’s and has subsequently been maintaining and monitoring the closed landfills that ceased operations between the mid-1960s and 2002. Post-Closure Landfill maintenance funding was originally created in 1995 to support the maintenance activities at the closed landfills for a minimum of a 20 years or 30-year term with the goal of rendering the landfills to an inert state.
At times, the period needed is greater than 20 years depending on the condition of these closed landfills, which is why there is ongoing maintenance costs. Most of the closed landfills have reached the end of their required minimum post-closure periods, but still require ongoing maintenance and monitoring and Solid Waste has created strategies to bring the landfills to a stable state.
Although some of the closed landfill planned post-closure periods have elapsed, regulations and the understanding of closure requirements have changed, requiring ongoing maintenance and monitoring until a stable state is reached. Moreover, Public Health-Seattle & King County and the Washington State Department of Ecology will decide if the division can end post-closure activities by demonstrating the landfill is stable. The Solid Waste Division has also undertaken capital improvement projects in addition to the maintenance program to identify whether the landfill gas control and treatment systems, the wastewater collection and treatment systems, and landfill cover systems need updating to facilitate the landfills reaching stabilization and reducing or concluding landfill operations. “Stabilization” is determined by “showing there is little or no settlement, gas production or leachate generation” as defined by Washington state landfill regulations.
Site | Year closed | Planned post-closure period |
---|---|---|
Puyallup/Kit Corner |
Mid-1960’s | Until stable |
Houghton |
1965 | Until stable |
Duvall |
1981 | Until stable |
Cedar Falls |
1985 | 1985-2005 |
Enumclaw |
1993 | 1993-2013 |
Hobart |
1994 | 1994-2014 |
Vashon |
2002 | 2002-2032 |
Key environmental attributes
- Groundwater quality improvements to meet regulatory compliance that are protective of human health and the environment, through installation and improvements to the environmental control systems;
- Reduce the potency of GHG emissions to the greatest extent feasible, through the collection and treatment of landfill gases;
- Achieving the above goals in order to minimize or terminate post-closure activities.
Project info
Green Bonds: 2017-Series A
$8.1m Green Bond Proceeds allocated
10% reduction in GHG emissions tCO2eq/year at Hobart Closed Landfill
20% reduction in GHG emissions tCO2eq/year at Enumclaw Closed Landfill
20% improvement key water quality parameter/year for Cedar Falls Landfill last two years
20% improvement key water quality parameter/year for Hobart Landfill last two years
5% improvement key water quality parameter/year for Enumclaw Landfill last two years
5% improvement in key water quality parameter per year for Vashon Landfill
Related information
Related agencies
Project | Date-Series | Amount of Green Bond proceeds spent to date |
Expected GHG emissions reduction |
Water improvement metrics |
---|---|---|---|---|
Duvall Landfill – Landfill Gas Control & Cover System Improvements | 2017-Series A | $0.8m |
Review in progress | Review in progress |
Houghton Landfill – Landfill Gas Control Improvements | 2017-Series A | $0.1m |
Review in progress |
Review in progress |
Cedar Falls Landfill – Landfill Gas Control Improvements | 2017-Series A |
$1.3m |
Review in progress |
20% improvement in key water quality parameter per year (for the past 2 years). |
Hobart Landfill – Landfill Gas Control & Cover System Improvements | 2017-Series A | $2.2m |
10% reduction in GHG emissions MTCO2e/yr | 20% improvement in key water quality parameter per year (for the past 2 years). |
Puyallup-Kit Corner Landfill – Landfill Gas Control Improvements | 2017-Series A |
$0.3m |
Review in progress |
Review in progress |
Enumclaw Landfill – Achieve Termination of Post Closure Status | 2017-Series A |
$1.1m |
20% reduction in GHG emissions MTCO2e/yr | 5% improvement in key water quality parameter per year (for the prior 2 years) |
Vashon Landfill – Leachate Pond Leak Detection |
2017-Series A |
$2.2m |
Review in progress |