Supplemental information
Bridges supporting mobility & connectivity through three east King County interchanges
Totem Lake Connector: City of Kirkland
- Totem Lake Connector 100 Percent Plan Drawings - Structural and Architectural
- Totem Lake Connector 100 Percent Plan Drawings - Civil and Landscape
- Cost options
- Feasibility studies
- TPL Connectivity Analysis for the Totem Lake Connector
- Appendix A 10% Drawings
- Appendix B Cost Estimate
- Appendix C Basis of Design
- Appendix D Geotechnical Borehole Logs
- Appendix E Wetland Delineation
- Appendix F APE Request Letter and Response
- Appendix G Hazardous Materials Report
- Appendix H Level of Service (LOS) Bridge Width
- Appendix I Public Outreach
- Appendix J Arborist Survey
- Appendix K Stopping Sight Distance
- Appendix L Utilities
- Appendix M Alignment Studies
- TPL Connectivity Analysis for the Totem Lake Connector
- Summary of relevant community plans:
- Planning studies and masters plans that mention the project, including drafts
- Any other relevant documents/supporting material
NE 8th Street and Wilburton Trestle at SE 8th Segment: City of Bellevue and King County
- NE 8th St design drawings
- Preliminary Design Report, Wilburton Trestle
- Cost options
- Concept plans
- Volume 1 – Final Master Plan and Environmental Impact Statement
- Volume 2 – Preliminary Plans for the Preferred Alternative
- Volume 3 – Master Plan and EIS Comments and Responses
- Wilburton Trestle Preliminary Design Report
- Wilburton Trestle Conceptual Image, Eastside Rail Corridor Regional Trail and Master Plan
- Display board: A Regional Trail Connecting the Eastside to Bellevue
- Display board: Typical Trail Cross-Sections, Eastside Rail Corridor Regional Trail and Master Plan
- Feasibility studies
- Ecosystem Evaluation of Alternatives
- Evaluation of Alternatives near Residential Neighborhoods
- Hazardous Materials Inventory Report
- Ecosystem Resources Inventory
- Corridor Right-of-Way Constraints
- At-Grade Intersection Inventory
- Historic and Cultural Resources
- Geological Conditions Inventory
- Community Meetings and Public Open Houses - Comments and Summary
- Connection Feasibility Studies
- Story map: Eastside Rail Corridor
- King County ERC page
- Summary of relevant community plans
- King County ERC Regional Trail Final Master Plan and Environmental Impact Statement
- Bellevue Pedestrian and Bicycle Implementation Initiative
- City of Bellevue Pedestrian and Bicycle Rapid Implementation Program Website
- 2009 City of Bellevue Pedestrian and Bicycle Transportation Plan Report
- The Bellevue Grand Connection Framework Plan
- All planning studies and master plans that mention the projects
- Any other relevant documents/supporting material
- 2016 King County Comprehensive Plan
- Determination of Significance and Request for Comments on Scope of EIS (June 2, 2015)
- Notice of Availability of the ERC Draft Master Plan and EIS and Notice of Public Meeting (Feb. 29, 2016)
- Notice of Availability of the Final Master Plan and Environmental Impact Statement (July 18, 2016)
- Final Master Plan and EIS SEPA Addendum #1 (Sept. 7, 2016)
- Notice of Action Taken (Aug. 1, 2017)