Project overview

Molasses Creek, a tributary stream to the Cedar River, is fed by headwater wetlands as well as other stormwater inputs. About a mile upstream from its mouth, Molasses Creek flows through a roughly quarter-mile-long stretch of 48-inch culvert pipe, which connects areas of good habitat. Downstream of this pipe system, Molasses Creek flows through a forested ravine.

This pipe system does not provide quality habitat and is a possible fish barrier. King County is studying how to improve fish passage and habitat along the existing pipe system. This study will help guide decisions about future capital projects. King County has already completed several capital projects to address aging infrastructure in the study area.

King County frequently works with interested landowners to purchase property in natural areas to improve habitat, conserve open space, and manage surface water.

A portion of the study area contains a 48-inch pipe system on property owned by Seattle Public Utilities. King County will work with the City of Seattle to explore restoring the creek and freeing the flow from the pipe, along all or a portion of this piped section. This study will inform project planning and discussions with stakeholders that may include the City of Renton, the Muckleshoot Indian Tribe, Washington Department of Fish and Wildlife, the City of Seattle, and the local community.

Project location

Molasses Creek drains portions of the Fairwood community before flowing into the Cedar River near River Mile 4.1. A stretch of the creek is confined in a pipe, preventing fish passage and reducing habitat.

Molasses Creek Fish Barrier and Habitat Improvement Study map
Molasses Creek in King County
Molasses Creek, a tributary to the Cedar River in King County, Washington

Goals

  • Study existing conditions.
  • Identify opportunities to remove fish barriers and improve fish habitat.
  • Explore restoring the creek for part or all of the piped area.
  • Learn about the community’s interest in this potential project, and possible voluntary sale of property.

Project benefits

The study project will help identify barriers and benefits to the community and environment.

Project schedule

Benchmark Period
Study begins Winter 2021
Property owner outreach phase Summer 2022 to fall 2022
Study concludes Spring 2023

Project documents

Project Overview Presentation (3.4 MB)

For more information about the Molasses Creek Fish Barrier and Habitat Improvement Study, please contact Rachel Berryessa, Engineer, King County Stormwater Services Section.