Skip to main content

Shadow Lake IAVMP

Shadow Lake IAVMP

December 2016

The Shadow Lake Integrated Aquatic Vegetation Management Plan (IAVMP) is the result of collaboration between King County Noxious Weed Control Program staff and Shadow Lake community members. The document was created over a one-year period from December 2015 through December 2016. King County Noxious Weed Control Program staff time for this project was funded by the program's general funds and community member time was entirely volunteered.

Click on the images below to download the Shadow Lake IAVMP and the Appendices (divided into separate documents). Please note you'll need the Acrobat Viewer to read the files.

Shadow Lake IAVMP, December 2016
Shadow Lake IAVMP December 2016 Cover Page - click to download document
Appendix 1, Community Involvement and Steering Committee
Shadow Lake IAVMP - Cover Page of Appendix 1 - Dec 2016 - click to download document
Appendix 2 – Control Method Options
Appendix 3 – Toxicity of Aquatic Herbicides
Appendix 4 – Herbicide labels
Appendix 5 – Best Management Practices
Appendix 6 – 2016 Herbicide Application Records
Shadow Lake IAVMP - Cover Page of Appendices 2 to 6 - Dec 2016 - click to download document

(Back to Annual Reports Page)

Related information

Related agencies


Program offices are located at 201 S. Jackson St., Suite 600, Seattle, WA 98104. To contact staff, see the Noxious Weed Control Program Directory, send an email, or call 206-477-WEED (206-477-9333).

expand_less