Sunset and Heathfield pump stations and force main upgrade
Substantial completion - April 2022
The Sunset and Heathfield pump stations and force main upgrade project reaches operational completion
We have reached operational completion on the Sunset and Heathfield Pump Station and Force Main Upgrade project! As King County operates this updated part of the system, we may still need to adjust the new equipment, but the bulk of the work is now complete and the areas we disturbed along the way have been restored. View final project update .
The Sunset and Heathfield Pump Stations and related sewer pipes send sewage from Sammamish, Issaquah, and Bellevue to be cleaned at King County’s treatment plant in Renton.
This project upgraded both pump stations, the connected force main pipe and the Eastgate Trunk structure near I-90. The Eastgate Trunk connects the force main pipe to a larger pipe, carrying flows to be treated at the South Treatment Plant in Renton. The improved system will help serve the growing population for many years.
Sunset & Heathfield Pump Station upgrades
Both pump stations are now upgraded so they can help transport sewage from the area for years to come. Some upgrade highlights:
- Four new pumps at each station increased the amount of wastewater the plants can process each day. capacity.
- 5,766 linear feet of new sewer pipe installed under 164th PIace SE and SE 35th PIace. The new 24 inch pipe replaced a 12 inch pipe, doubling the capacity.
- Two new standby generators to allow the stations to continue operating during power outages and avoid a sewage overflow.
- The stations both have new roofs, including a green roof at Sunset.
- A novel oxygen injection odor and corrosion control system was installed at Heathfield Pump Station This new system will reduce pipe corrosion and extend the life of the carbon bed odor control units at the pump stations.
- New energy-efficient lighting at both stations as well as a new fence at the Sunset Pump Station to enhance safety and security. Both the lighting and fence design were based on community preferences.
Environmental enhancements
The project prioritized sustainability, fish and wildlife habitat, and green stormwater infrastructure, including:
- Installed a new green roof at Sunset Pump Station to reduce rainwater runoff and improve water quality.
- Planted new trees throughout the project area, replacing trees removed by the project in wetland and stream buffers at a ratio of about 5:1.
- Improved fish habitat by creating a low-flow channel in Vasa Creek and restoring the Lake Sammamish shoreline at the Sunset Pump Station with native plants and large woody material.
- Enhanced the nearby environment and wetlands by removing invasive species and planting native vegetation, adding grading to reduce erosion, and installing animal habitat features like bat houses.
24-hour emergency and odor reporting:
Contact South Treatment Plant at 206-263-1760.
Public involvement meetings
Thursday, July 20, 5:30 – 7:30 p.m.
Vasa Park Ballroom
3560 West Lake Sammamish Parkway S.E.
Bellevue, WA 98008
Pre-construction open house
At the open house, you can:
- Get the latest on initial construction schedule, planned work activities, and work hours
- Meet the construction team, including the construction contractor
- Learn about potential construction impacts
- Bring the whole family to enjoy educational activities
Handouts/presentations and additional information :
- Project Overview
- How Community Feedback Impacted Design
- Heathfield Pump Station Final Design
- Heathfield Pump Station Construction
- Sunset Pump Station Final Design
- Sunset Pump Station Construction
- Tentative Construction Schedule
- Force Main Upgrade Construction Impacts
- Project Work Areas and Street Closures
- Staying Informed During Construction
January 28, 2017
1:00-3:00 p.m.
Vasa Park Ballroom
3560 West Lake Sammamish Pkwy SE, Bellevue
Open house and pump station tours.
Join us for an open house to review the most recent design plans for the pump stations and force main alignment, speak with project staff, and tour the current pump stations.
Handouts/presentations and additional information:
April 6, 2016
6:30 - 7:30 pm
Vasa Park Ballroom
3560 West Lake Sammamish Pkwy SE, Bellevue
Community meeting
Purpose:
- Introduce new project community relations lead De’Sean Quinn
- Share project update on Sunset and Heathfield pump stations and force main upgrade including schedule update and current design status
- Gather input on preference for the color of the generator enclosure at the pump station
- Hear community perspectives, concerns, and questions
Handouts/presentations and additional information:
- Agenda
- Sunset pump station conceptual site layout
- Sunset pump station roof sightlines
- Examples of green roofs
- Sunset pump station generator color preference
- Heathfield pump station generator color preference
- Summary of sunset pump station Neighborhood briefing
- Summary of generator enclosure color outreach
March 3, 2015
6:30 to 8:00 p.m.
Vasa Park Ballroom
3560 West Lake Sammamish Pkwy SE, Bellevue
Open house. Learn about the project, share your input and meet project staff.
Handouts/presentations and additional information:
February 23 - March 6, 2015
Online open house. Learn about the project, share your input and take the online survey.
Handouts/presentations and additional information
- Archived site pages for sunsetheathfield.publicmeeting.info
November 5, 2014
6:30 - 7:30 pm
Vasa Park Ballroom
3560 West Lake Sammamish Pkwy SE, Bellevue
Neighborhood briefing on Sunset Pump Station roof design.
Handouts/presentations and additional information:
Project updates and resources
- The Sunset and Heathfield pump stations and force main are now operational, November 2022
- Construction Update: Generator replacement pending equipment delivery, November 8, 2021
- Construction Update: Single-lane closures this week and next, March 1, 2021
- Construction Update: Single-lane closure planned for February 9 on West Lake Sammamish Pkwy, February 5, 2021
- Construction Update: Single-lane closure planned for January 12 & 19 on West Lake Sammamish Pkwy, January 8, 2021
- Construction Update: Restoration and pump station work continue, November 23, 2020
- Construction Update: Single-lane closure scheduled for Saturday, October 31 on West Lake Sammamish Pkwy, October 30, 2020
- Construction Update: Restoration and pump station work continue, October 16, 2020
- Construction Update: Vasa Creek restoration beginning Friday with erosion control work; creek and bank work to follow, September 10, 2020
- Construction Update: Single-lane closure scheduled for September 2 on West Lake Sammamish Pkwy, August 31, 2020
- Construction Update: Restoration along SE 35th St and at the Sunset Pump Station, August 17, 2020
- Construction Update: Upcoming closure of SE 38th St and lane closure on W Lake Sammamish Pkwy, July 21, 2020
- Construction Update: Single-lane closures begin for restoration activities, July 15, 2020
- Construction Update: Landscape restoration postponed, June 12, 2020
- Construction Update: Single-lane closures resume to continue restoration activities, June 8, 2020
- Spring newsletter, April 2020
- Construction Update: landscape restoration on SE 35th Pl and 164th Pl SE; upcoming single lane closures on SE 35th Pl., January 21, 2020
- Construction Update: Work now focused on pump stations. Restoration along SE 35th Pl and 164th Pl SE coming in 2020. December 12, 2019
- Construction Update: Single-lane closure on SE 35th Pl on Monday, November 4, November 4, 2019
- Restoration and ongoing single lane closures continue this week, October 10, 2019
- Construction Update: Road closure extended for re-installation of ornamental crosswalk on SE 38th Pl, September 25, 2019
- Construction Update: Road closures for ornamental crosswalk re-installation; single lane closures continue, September 18, 2019
- Construction Update: Upcoming weekend road closures on SE 35th Pl for sidewalk restoration and street paving, August 27, 2019
- Construction Update: Upcoming restoration work on SE 35th Pl will require lane closures, August 15, 2019
- Construction Update: Road restoration to begin as soon as Monday, July 22, July 15
- No construction July 4 through July 7; 164th Pl SE will remain closed during this time, July 2, 2019
- Construction Update: 164th Pl SE closure begins Monday; no roadwork this weekend, June 14, 2019
- Construction Update: Full road closure on 164th Pl SE beginning as early as Monday June 17, June 6, 2019
- Force main investigation continues; no work on Memorial Day, May 24, 2019
- Crews continue to investigate the new force main pipe, May 10, 2019
- Construction Update: Weekend work, April 26, 2019
- Update: Single-lane closures resume at SE 35th Pl, April 23, 2019
- Reminder: W Lake Sammamish Pkwy overnight closure begins tonight; upcoming single-lane closures for restoration, April 5, 2019
- Construction Update: 164th Pl SE open; upcoming closure on W Lake Sammamish Pkwy SE; extended work hours for pump stations, March 28, 2019
- Reminder: Upcoming road closures on SE 35th Pl and SE Eastgate Way; repaving of 164th Pl SE, March 21, 2019
- Construction Update: Two upcoming road closures and shoring removal, March 14, 2019
- Thirty (30) minute rolling road closure on Thursday, Feb. 21; work is weather dependent, Feb. 20, 2019
- Construction Progress Update, January 17, 2019
- Construction Update: King County reviewing project traffic control to respond to community concerns, December 28, 2018
- Construction Progress Update: Single-lane closures on SE 35th Pl and W Lake Sammamish Pkwy SE, November 29, 2018
- Construction Update: SE 35th Pl weekend full closure planned from November 16 – 19 for road restoration, November 8, 2018
- Construction Update: Pipe installation continues; full road closure resumed on 164th Pl SE at Vasa Creek, November 1, 2018
- Construction Progress Update, October 25, 2018
- Construction Update: Upcoming Saturday work; W Lake Sammamish Pkwy SE overnight closure; Vasa Creek update, October 5, 2018
- Construction Update: Vasa Creek Update; W Lake Sammamish Pkwy SE overnight closure; open cut along SE Eastgate Way, September 27, 2018
- Construction Update: road closures, September 20th
- Construction Update: Progress update; road closures continuing, September 13, 2018
- Construction Update: Road closure updates, August 29, 2018
- Construction Update: Single-lane closures on W. Sammamish Parkway SE, August 14, 2018
- Construction Update: Single-lane closures on SE 35th Pl continue into the evening as crews repair a gas line; Saturday work begins on 164th Pl SE, August 9, 2018
- Construction Update: Cancelled weekend closure on Southeast 35th Place and extended closure planned on 164th Place Southeast, July 26, 2018
- Construction Update: Southeast 35th Place weekend closure postponed to 6 p.m. July 27 – 6 a.m. July 30, July 19, 2018
- Construction Update: Southeast 35th Place weekend closure planned from July 20 – July 23, July 16, 2018
- Construction Update: 164th Place Southeast road closure POSTPONED, pit excavation to begin, July 3, 2018
- Construction Update: Upcoming long-term 164th Place Southeast road closure, June 28, 2018
- Updated Closure Schedule: Southeast 35th Place weekend closure now planned to close from 6 p.m. June 22 – 6 a.m. June 25, June 20, 2018
- Construction Update: Southeast 35th Place weekend closure planned from June 22 – June 25, June 18, 2018
- Construction Update: Southeast 35th Place weekend closure planned from June 22 – June 25, June 12, 2018
- Upcoming trenchless work on 164th Place Southeast and open cut on Southeast 35th Place to begin in early June, May 29, 2018
- Crews continue open cut construction on 164th Place Southeast; weekend work not expected for the next three to four weeks, May 18, 2018
- Schedule update: Open cut construction on 164th Place Southeast scheduled to begin as early as Monday, May 14, May 10, 2018
- Open cut construction on 164th Place Southeast now scheduled for early to mid-May, April 27, 2018
- Crews prepare for open cut construction on 164th Place Southeast; expect lane closures and delays as early as April 23, April 16, 2018
- Upcoming road closures on 164th Place Southeast for sewer pipe installation, March 23, 2018
- Work underway to straighten floating pipe ahead of pullback. Pullback scheduled to begin on Friday, March 16, March 14, 2016
- Pipe pullback rescheduled for as early as the week of Feb. 26: 16-24 hours of nonstop weather-dependent work, February 20, 2018
- Pipe pullback scheduled to start as early as Wednesday, Feb. 21; 16-24 hours of nonstop weather-dependent work. February 16, 2018
- Heads up: 16-24 hours of upcoming nonstop work as crews pull pipe underground, February 5, 2018
- HDD work continues weekdays and weekends to prepare for pipe pull, January 28, 2018
- HDD work continues weekdays and weekends at the HDD staging area and near Vasa Park, January 19, 2018
- Pump station and weekend HDD work continues, January 12, 2018
- Heads up: Southeast 35th Place CLOSED Jan. 5-8; other work continues, December 21, 2017
- Sewer pipe preparation work continues, December 15, 2017
- Sewer pipe preparation work continues. Increased noise and additional weekend work expected on December 17. December 8, 2017
- Frequently Asked Questions, updated December 2017
- Increased noise and weekend work as crews prepare for pipe installation, December 1, 2017
- Crews continue to prepare for Horizontal Directional Drilling (HDD) at Sunset Pump Station; HDD work to continue through Spring 2018, November 22, 2017
- Sewer pipe preparation work continues with weekend work, beginning this weekend, November 16, 2017
- Sewer pipe installation preparation continues – expect increased noise, October 30, 2017
- Potholing along Southeast 38th Street and 164th Avenue Southeast and early work ahead of Horizontal Directional Drilling, October 9, 2017
- New sewer line installation continues along Southeast 35th Place, September 25, 2017
- New sewer line installation starts next week – expect single lane closures on Southeast 35th Place, September 11, 2017
- Construction Update – August 15, 2017
- Fall newsletter, December 2016
- Fact sheet: How King County's new sewer pipeline will be installed in Southeast Bellevue, July 2016
- Utility upgrades at the Heathfield Pump Station scheduled to begin Wednesday, June 29, June 28, 2016
- Summer newsletter, June 2015
- Mountains to Sound Greenway and I-90 trail access closed August 4 - 6, Aug. 4, 2014
- Geotechnical field investigations starting as early as Monday, July 28, July 22, 2014
- Geotechnical field investigations in your neighborhood this summer, July 1, 2014
- King County is upgrading the Sunset and Heathfield pump stations and conveyance, February 2014
- Upgrades coming to the Sunset and Heathfield wastewater facilities near you! November 2013
- Alternative selected for South Lake Sammamish, August 2013
- Sunset Pump Station Final Design
- Heathfield Pump Station Final Design
- Force main alignment
- Project area (368KB)
- As-built drawings
- Pump stations (.zip file, 73MB)
- Forcemains (.zip file, 20MB)
- DNS announcement and SEPA environmental checklist, September 17, 2015
- Determination of Nonsignificance (DNS) mailer, September 17, 2015
- Project Initiation Document, March, 2008 (1.43MB)
This document consolidates information on the project developed during regional wastewater conveyance system planning. This is the final document produced in project planning. The purpose of the document is to transfer the project from conveyance system planning to the design phase.- Attachment 1. Project area
- Attachment 2. South Lake Sammamish planning basin
- Attachment 3. Hydraulic analysis of the conveyance system limiting the Sunset Heathfield capacity upgrade
- Attachment 4. Tabula cost estimate information
- The Conveyance System Improvement (CSI) program update, June 2007, provides the most current information for this project.
The update identifies projects needed for increasing capacity in the regional wastewater conveyance system to accommodate population growth; and, also provides a status on the County's asset management program for replacing or substantially rehabilitating deteriorated portions of the system. It then lays out a schedule and budget for these projects. The need for the Sunset/Heathfield Project is documented in this report.